Thursday, 12 November 2009

Laying down and wetting out


This week we removed the wires from all the seams before flipping the canoe over to fill all the seams with thickened epoxy from the inside - leaving slight fillets as required.





The next stage was to paint (unthickened) epoxy along the seams and lay out strips of 2inch fibreglass tape. This was then wetted out and left to soak in and cure.


No comments:

Post a Comment